Routine FBiH Civil Protection report on water levels, fires and weather warnings for 24-25 November 2026
Summary
The Federal Civil Protection Administration reported water levels on rivers in Herzegovina-Neretva Canton, small fires in Sarajevo, Čapljina, Orašje and Bihać, and a boil-water advisory in Bihać due to turbidity at water sources, while the Federal Hydrometeorological Institute issued a yellow warning for wind and rain and a flash-flood notice for the Neretva basin with a peak expected 26-27 November 2026.
This summary was written by a language model from the one source listed below.
Extract from the source
POPLAVE – VODOSTAJI Hercegovačko-neretvanski kanton | VODOTOK | HIDROLOŠKA POSTAJA | VRIJEME | VODOSTAJ | REDOVNA OBRANA OD POPLAVA | | Neretva | Glavatičevo |
Main source
Locations
- Place
The model names places and sections as the sources do; every point comes from Vidik’s register of places and sits at the centre of the named place, not at an exact location. A section is marked on the road itself when the map knows its number (A1, M-17); otherwise it is a dashed line between its ends. A name the register does not recognise is not drawn. Colour shows the event’s severity.
- River the sources name
- Municipalities the named stretch flows through
The model names the river as the sources do; its course is from OpenStreetMap (© OpenStreetMap). Its upper, middle and lower stretches are divided at Vidik’s split points. Shaded are the municipalities the named stretch flows through: this is not the river’s basin, and not an assessment of consequences. A river’s condition is what the sources say of its water, and whom they cite; it is not Vidik’s assessment.
Locations
- Neretva · River · middle and lower course
Warning: possible overflow (forecast)according to: Federalni hidrometeorološki zavod
Municipalities it flows through: Mostar (60.3 km), Čapljina (19.1 km), Jablanica (15.2 km), Ploče (10.5 km), Čitluk (7.5 km)
+ 3 more municipalities
Metković (5.6 km), Opuzen (3.0 km), Kula Norinska (2.5 km)
Places mentioned in the report
Sources (1)
- 10:02 AMFederalna uprava civilne zaštiteOpen the original
A headline and an extract of at most 25 words. The full text is never published; every source is named and linked.
How the signal is calculated
Total — strong signal (40–69)