Justice
Strong signal40 / 100Media signal is not an assessment of danger.
Most favourable bidder selected for passenger vehicle servicing at Neretva Hydropower Plants subsidiary
Summary
JP Elektroprivreda BiH published a decision selecting the most favourable bidder for passenger vehicle maintenance and servicing under warranty for the Neretva Hydropower Plants subsidiary in Jablanica, without further details on the bidder's identity or contract value.
This summary was written by a language model from the one source listed below.
Extract from the source
Odluka o izboru najpovoljnijeg ponuđača za nabavku usluge održavanje i servis putničkih vozila u garantnom periodu za potrebe Podružnice Hidroelektrane na Neretvi, Jablanica
Main source
Locations
Loading the map…
Administrative boundaries, not incident extent
Municipality: Jablanica
Places mentioned in the report
Sources (1)
- 03:12 PMJP Elektroprivreda BiHOpen the original
A headline and an extract of at most 25 words. The full text is never published; every source is named and linked.
How the signal is calculated
Signal strength40
Total — strong signal (40–69)