Skip to content
A short overview of events, with location, time and sources.
Vidik. Medijski signal: jak.
All events
Strong signal40 / 100Media signal is not an assessment of danger.

Blasting works announced at Mostar south bypass construction site

Summary

Construction company HP Investing Mostar has announced blasting works as part of excavation at the site of the Mostar South Bypass, planned for Friday, October 16, 2026, between 11:00 and 13:00, with residents urged to follow marshals' instructions and traffic signage.

This summary was written by a language model from the 3 sources listed below.

Extract from the source

MOSTAR, 15. listopada (FENA) – Izvođač radova „HP INVESTING“ d.o.o. Mostar obavještava javnost da su u sklopu širokog iskopa na lokaciji izgradnje Južne obilaznice Mostara

Main source

11:42 AMFENA (Federalna novinska agencija)Open the original

Locations

Loading the map…

Administrative boundaries, not incident extent

  • Municipality: Mostar

Places mentioned in the report

  • where it happenedMostar - site of the Mostar South Bypass construction

Sources (3)

3 reports · 2 sources

A headline and an extract of at most 25 words. The full text is never published; every source is named and linked.

How the signal is calculated
Signal strength40

Total — strong signal (40–69)

Vidik measures media signal intensity. It does not predict events and it does not assess danger. Methodology

Report an error in this event