Infrastructure, Road closure
Strong signal40 / 100Media signal is not an assessment of danger.
Blasting works announced at Mostar south bypass construction site
Summary
Construction company HP Investing Mostar has announced blasting works as part of excavation at the site of the Mostar South Bypass, planned for Friday, October 16, 2026, between 11:00 and 13:00, with residents urged to follow marshals' instructions and traffic signage.
This summary was written by a language model from the 3 sources listed below.
Extract from the source
MOSTAR, 15. listopada (FENA) – Izvođač radova „HP INVESTING“ d.o.o. Mostar obavještava javnost da su u sklopu širokog iskopa na lokaciji izgradnje Južne obilaznice Mostara
Main source
Locations
Loading the map…
Administrative boundaries, not incident extent
Municipality: Mostar
Places mentioned in the report
Sources (3)
3 reports · 2 sources
- 11:42 AMFENA (Federalna novinska agencija)Open the original
- 11:45 AMVečernji list BiHOpen the original
- 11:58 AMFENA (Federalna novinska agencija)Open the original
A headline and an extract of at most 25 words. The full text is never published; every source is named and linked.
How the signal is calculated
Signal strength40
Total — strong signal (40–69)