Infrastructure, Road closure
Strong signal44 / 100Media signal is not an assessment of danger.
Works at the Zagreb zapad interchange on the A2 motorway cause tailbacks
Summary
Croatian Motorways (HAC) will repair expansion joints on the western bridge of the Zagreb zapad interchange, on the A2-to-A3 link toward Lučko, from Saturday 17 to Monday 26 October, with traffic regulated in three phases and longer tailbacks expected especially during peak hours.
This summary was written by a language model from the 3 sources listed below.
Extract from the source
Hrvatske autoceste (HAC) od subote, 17. listopada, do ponedjeljka, 26. listopada, sanirat će prijelazne naprave na zapadnom mostu čvora Zagreb zapad, zbog čega se na
Main source
Locations
- Lučko · City / settlement
Place named; boundary not confirmed.
Sources (3)
- 10:11 AMN1 HrvatskaOpen the original
- 10:23 AMJutarnji listOpen the original
- 10:24 AMIndex.hrOpen the original
A headline and an extract of at most 25 words. The full text is never published; every source is named and linked.
How the signal is calculated
Signal strength44
Total — strong signal (40–69)