Skip to content
A short overview of events, with location, time and sources.
Vidik. Medijski signal: jak.
All events
Strong signal66 / 100Media signal is not an assessment of danger.

Overview of road conditions in Bosnia and Herzegovina: works on several sections and fog in valleys

Summary

BIHAMK and agencies report that traffic in Bosnia and Herzegovina flows without extraordinary restrictions, apart from reduced visibility from fog in valleys and works causing altered traffic regimes on several sections including the A-1 motorway and main roads. Border crossings report waits of up to 30 minutes for passenger vehicles, with possible longer delays due to the new EU EES entry/exit registration system.

This summary was written by a language model from the 7 sources listed below.

Extract from the source

Na cestama u Bosni i Hercegovini saobraća se bez vanrednih ograničenja, sa izuzetkom dionica gdje se izvode sanacioni radovi i gdje je saobraćaj regulisan privremenom

Main source

06:32 AMDnevni avazOpen the original

Locations

Map · 11 locations
Loading the map…
  • Road section
  • The road it is on
  • Route unknown: a line between its ends
  • Place

The model names places and sections as the sources do; every point comes from Vidik’s register of places and sits at the centre of the named place, not at an exact location. A section is marked on the road itself when the map knows its number (A1, M-17); otherwise it is a dashed line between its ends. A name the register does not recognise is not drawn. Colour shows the event’s severity.

Locations

Places mentioned in the report

  • where it happenedBosna i Hercegovina - general report on road conditions in the country
  • where it happenedKakanj - A-1 motorway section closed to all vehicles
  • where it happenedGolubinja - motorway subsection closed due to works
  • where it happenedSarajevo - A-1 motorway section Sarajevo West-Lepenica
  • where it happenedJablanica - main road with restriction for vehicles over 3.5 tonnes
  • where it happenedBrčko - border crossing and road section toward Bijeljina
  • where it happenedVelika Obarska - freight vehicles over 3.5 tonnes routed through the settlement
  • where it happenedMostar - slow traffic due to works on the main road
  • where it happenedČitluk - works on the main road toward Hum
  • where it happenedSkokovi - pedestrian-path works on the main road
  • where it happenedŠiroki Brijeg - pedestrian-path works on the main road
  • where it happenedGrude - pedestrian-path works on the main road

Sources (7)

A headline and an extract of at most 25 words. The full text is never published; every source is named and linked.

Severity
Severity66

Total — strong signal (40–69)

Vidik measures media signal intensity. It does not predict events and it does not assess danger. Methodology

Report an error in this event