Skip to content
A short overview of events, with location, time and sources.
Vidik. Medijski signal: jak.
All events
Strong signal59 / 100Media signal is not an assessment of danger.

Roadworks and fog slow traffic on several road sections in Bosnia and Herzegovina

Summary

Bosnia's motoring association BIHAMK reported slowed traffic across several motorway and trunk-road sections due to repair and construction works, along with fog reducing visibility in valleys and along rivers. Border crossings see delays of 10 to 30 minutes, while some sections are fully closed to all or heavier vehicles, including the A-1 motorway Kakanj-Lašva section and the Golubinja-Nemila sub-section.

This summary was written by a language model from the 5 sources listed below.

Extract from the source

Brojni radovi i magla usporavaju saobraćaj u BiH, vozačima upućeno upozorenje Piše: N. F. | Iz BIHAMK-a su uputili apel vozačima da voze maksimalno oprezno,

Main source

06:49 AMOslobođenjeOpen the original

Locations

Map · 12 locations
Loading the map…
  • Road section
  • The road it is on
  • Route unknown: a line between its ends
  • Place

The model names places and sections as the sources do; every point comes from Vidik’s register of places and sits at the centre of the named place, not at an exact location. A section is marked on the road itself when the map knows its number (A1, M-17); otherwise it is a dashed line between its ends. A name the register does not recognise is not drawn. Colour shows the event’s severity.

Locations

Places mentioned in the report

  • where it happenedBosna i Hercegovina - general bulletin on road conditions in the country
  • also affectedKakanj - A-1 motorway section closed
  • also affectedGolubinja - sub-section closed due to ongoing construction
  • also affectedSarajevo - A-1 motorway section Sarajevo West-Lepenica
  • also affectedDobro Polje - traffic limited to vehicles up to 3.5 tonnes
  • also affectedJablanica - traffic limited to vehicles up to 3.5 tonnes
  • also affectedBrčko - Brčko-Bijeljina trunk road and the Brčko border crossing
  • also affectedSkokovi - pedestrian path construction works
  • also affectedŠiroki Brijeg - pedestrian path construction works
  • also affectedGrude - pedestrian path construction works
  • also affectedŠamac - pedestrian path construction works
  • also affectedMostar - slowed traffic towards Čitluk and Hum hill
  • also affectedKarakaj - border crossing open to all vehicle categories

Sources (5)

A headline and an extract of at most 25 words. The full text is never published; every source is named and linked.

How the signal is calculated
Signal strength59

Total — strong signal (40–69)

Vidik measures media signal intensity. It does not predict events and it does not assess danger. Methodology

Report an error in this event