Vidik. Stepen eskalacije: napeto.
← All events
Tense65 / 100JusticeMedia signal is not an assessment of danger.

Wall collapse in Voždovac: prosecutor's office opens case, inspectorate deploys full capacity

started September 24, 2026 at 8:54 AM · last changed 13h ago

Summary

After a supporting wall collapsed at a construction site in Vojvode Vlahovića Street in Belgrade's Voždovac district, the city's inspection secretariat said it has deployed all capacity, on the prosecutor's order, to establish possible failures by the investor, contractor and site supervision, while the Higher Public Prosecutor's Office anti-corruption department opened a case and the group Ekološki ustanak called for a review of all construction permits.

This summary was written by a language model from the 20 sources listed below.

Extract from the source

Ekološki ustanak povodom rušenja potpornog zida u naselju Braće Jerković, saopštava da nakon smene režima hitno treba revidirati sve građevinske dozvole, kako u Beogradu, tako

Main source

08:54 AMDanasOpen the original ↗

Locations

Map of the Western Balkans with the municipalities of Bosnia and Herzegovina

Administrative boundaries, not incident extent

  • Braće Jerković · Neighbourhood

    Place named; boundary not confirmed.

  • Municipality: Beograd

  • Municipality: Beograd

Places mentioned in the report

  • Braće Jerković
  • where it happenedVoždovac - the Braće Jerković neighbourhood where the wall collapsed
  • where it happenedBeograd - city where the construction site is located, under the city inspection secretariat

Timeline

  1. U naselju Braće Jerković na Voždovcu urušio se dio potpornog zida na gradilištu u Ulici Vojvode Vlahovića, a u nastalu rupu propao je automobil, dok su stanari najbližih objekata evakuisani. Dežurni tužilac obavio je uviđaj i naložio utvrđivanje okolnosti, građevinska inspekcija zatvorila je gradilište, a organizacija Ekološki ustanak zatražila je reviziju svih građevinskih dozvola u Beogradu i Srbiji.

    Start

  2. New reports add that Belgrade's inspection secretariat, on the prosecutor's order, deployed full capacity to check for failures by the investor, contractor and supervision, that the prosecutor's anti-corruption department opened a case, and that the group Ekološki ustanak called for a review of all construction permits; some residents reportedly announced lawsuits and said they had previously flagged problems at the site.

    Voždovac · 4 sources

Each entry's time is when Vidik recorded the change, in the order reports arrived. Entries are written by a language model from the reports new in each interval; once written, they are never changed.

Sources (20)

20 reports · 7 sources

A headline and an extract of at most 25 words. The full text is never published; every source is named and linked.

Severity
Severity65

Total — band tense (40–69)

Vidik measures media signal intensity. It does not predict events and it does not assess danger. Methodology

Report an error in this event