Napeto46 / 100Infrastructure
Electrical power activated in contact network of Ilidža–Hrasnica tram line
Summary
The Sarajevo Canton transport ministry activated 660-volt power in the contact network of the newly built Ilidža–Hrasnica tram line on 16 August 2026 at 20:30, beginning system testing ahead of passenger service launch; officials stress that new traffic conditions require careful attention from drivers and pedestrians.
This summary was written by a language model from the 3 sources listed below.
Extract from the source
Ovo označava, kako je ocijenio sam Šteta, historijski trenutak za Sarajevo i Ilidžu te predstavlja jedan od ključnih i završnih koraka pred samo puštanje tramvaja
Locations
Only the locations this event's sources named.
Severity46
Total — band napeto (40–69)
Sources (3)
- 08:20 PMKlix.baOpen the original ↗
- 08:20 PMRadiosarajevo.baOpen the original ↗
- 08:33 PMN1 BiHOpen the original ↗
A headline and an extract of at most 25 words. The full text is never published; every source is named and linked.