Povišeno38 / 100Accidents and natural hazards
Hungary launches works to raise Danube water levels due to reduced capacity at Paks nuclear plant
Summary
Hungarian authorities are conducting emergency works to raise Danube water levels, as the Paks nuclear plant has dropped to just over 10 percent capacity due to water scarcity. About 145,000 cubic meters of stone will be delivered and a dam is planned as a long-term solution.
This summary was written by a language model from the 2 sources listed below.
Extract from the source
Mađarske vlasti će ove nedelje početi radove na podizanju nivoa Dunava kako bi obezbedile nastavak rada jedine nuklearne elektrane u zemlji - Pakš, izjavio je
Locations
Only the locations this event's sources named.
Severity38
Total — band povišeno (20–39)
Sources (2)
- 08:00 PMN1 SrbijaOpen the original ↗
- 08:05 PMKurirOpen the original ↗
A headline and an extract of at most 25 words. The full text is never published; every source is named and linked.