Mirno18 / 100
REŠENJE PROBLEMA PIJAĆE VODE ZA SKORO 500. 000 LJUDI: Predsednik Vučić obišao radove na izgradnji brane sa akumulacijom Svračkovo na reci Veliki Rzav (FOTO)
Summary
President Vučić visited construction of the Svračkovo dam on the Great Rzav river, scheduled for completion by 2030 to supply drinking water to about 500,000 people, with a planned capacity of 28 million cubic meters and a small hydroelectric plant, investment valued at around 120 million euros.
This summary was written by a language model from the 2 sources listed below.
Extract from the source
Predsednik Srbije Aleksandar Vučić obišao je danas radove na izgradnji brane sa akumulacijom Svračkovo na reci Veliki Rzav, u opštini Arilje, i istakao da je
Locations
Only the locations this event's sources named.
Severity18
Total — band mirno (0–19)
Sources (2)
- 04:45 PMGDELT DOC 2.0 APIOpen the original ↗
- 05:14 PMKurirOpen the original ↗
A headline and an extract of at most 25 words. The full text is never published; every source is named and linked.